Over two days Drain Technology engineers have undertaken one of the most challenging lining jobs we have ever done. 

A 400mm diameter duct with two 90 degree rectangle bends with in the run. 

But through some lateral thinking and the experience of the team, plus the support of a manufacturer, the job was completed to a high standard.